IRIS Metals reports strong lithium results at Beecher Project

Iris Metals Limited (ASX:IR1) continues to report significant progress in its ongoing diamond drilling program at the Beecher Project, situated in the Black Hills of South Dakota, with the latest results revealing new wide and high-grade lithium intersections, including 27.8 metres at 1.90% Li₂O from 70.7 metres.

Diamond drilling program

The program persists in yielding encouraging outcomes, with additional holes showcasing notable lithium intersections.

Noteworthy results include BDD-23-011, which revealed 27.8 metres at 1.90% Li₂O from 70.7 metres, and BDD-23-015, indicating 18.7 metres at 1.03% Li₂O from 29.3 metres, along with 7.3 metres at 1.21% Li₂O from 194.5 metres.

Click to read full article by Georgia Wilson from The Market Bull 

SHARE THIS ARTICLE